Thursday, August 5, 2010

Sunroom Windows

We replaced the picture window and the two windows on either side of it in the sunroom yesterday. We planned to begin around 10:00 a.m. or 11:00 a.m., but an unexpected Lowe's trip that turned into an unexpected Home Depot trip pushed our starting time to noon. We worked for 5 or 6 hours and took a break for a few hours. Justin wanted to complete the moulding on these windows, so at 9:00 p.m., we headed back to the sunroom to completely finish. It only took about an hour and then we cleaned the room and called it a night.

We picked up eight windows last Friday and have installed seven. I'll be so glad when we get that eighth window installed and can take a break.

The obligatory before photo:

The picture window has been replaced. One side window has been removed and one is still original.
All three windows have been replaced and Justin is caulking the outside.
Yay! We are finished with these three windows!

1 comment:

  1. Looks great - those are some nice windows and the fit looks right.

    ReplyDelete