Wednesday, April 1, 2009

Floor (Part 2)

The oak strips have been installed (nailed) and sanded. The floor guy will stain and seal everything soon (this week, maybe?). We are very excited!

These two pictures are of the sunroom. This is the cabin grade wood (see previous post). Justin and I are very pleased with this floor. This room needs to be painted, but that will have to wait until the floor is finished. Ideally, we would have painted before the floor was installed, but Justin and I don't always do things how we should.





These two pictures are of the master bedroom. This wood is identical to the wood in the rest of the house. We are extremely happy with this room, too. White base moulding with stained quarter round (stained to match the floor) will be installed in this room and the sunroom to "finish" the floors. We cannot wait!